Between 1 square foot and 1 acre of soil disturbance: Erosion and Sediment Control Plan (ESCP) Worksheet or ESCP Specification sheet within the improvement plans required.
Greater than 1 acre: Storm Water Pollution Prevention Plan (SWPPP) required. Refer to the State Water Resources Control Board's Construction Storm Water Program
Post-Construction Requirements by Size of Project
Less than 2500 square feet of impervious area created: Post construction treatment is not required
Between 2500 and 5000 square feet of impervious area created: Small project post construction treatment required. Use the state water board calculator to design your post construction features